Loading...

Advanced Calculations

To be able to fill the form and get the results, please register.

You have already registered? Please login.

  • Construction Year: The time it takes to build a greenhouse. Default is one year.

  • Greenhouse Area: the total surface of the greenhouse, including packaging area, technical room etc.

  • Tax on Profit: depends on your country/state

  • IMPORTANT: Please note that we ALWAYS consider the price [€/m²] based on the total greenhouse area. For example: if the greenhouse Area is 10,000 m2, and the growing Area is 9,000 m2, we consider 10,000 m2 (1 ha) in our calculation to calculate the total costs of irrigation system. For example, if the irrigation system cost is 8 [€/m²], the costs of irrigation system in our calculation is 80,000 €

  • Cultivation Area: surface area of the greenhouse used for cultivation. "Cultivation Area" is only used to calculate the production of the greenhouse.

  • Target Production: means the amount of crop (e.g. tomato/cucumber etc.) which is produced in growing area every single year

  • Average Price: the average annual price of the crop (e.g. tomato, cucumber etc.)

  • [%/year]
  • Increase in Product Price, for example, the annual increase of tomato price in % per year

  • Increase in Variable Cost, for example, annual increase in energy, fertilizer, water in % per year. You may refer to "Variable Costs - Cultivation" section bellow.

  • Increase in Personnel Salaries: in this section, we consider increases specified for the personnel. You may refer to the "Variable Costs - Personnel" section bellow.

  • Increase in Administrative Costs. For example: office rent etc. You may refer to the "Variable Costs - Office" section bellow.

  • NOTE: You can fill either the green cells OR ONLY the white cells above it. YOU CAN NOT fill both.

    Price [€/m²]
    Maintenance [%/m2/year] Depreciation [Year]
  • Permits and Certificates: for example, certificate costs of constructing the greenhouse

  • Facilities: for example, costs of gas, electricity, water supplies

  • Leveling: the cost of leveling the land

  • Administrative Costs: for example, the costs of constructing offices

  • Other costs (e.g. land purchase)

  • NOTE: You can ONLY fill either the green cells, OR the white cells above them. You CAN NOT fill both.

  • NOTE: You can fill either the green cells OR ONLY the white cells above it. YOU CAN NOT fill both.

    Price [€/m²] Maintenance [%/m2/year] Depreciation [Year]
  • Greenhouse Structure: including the covering, the ventilation windows etc.

  • Cultivation System: including the gutters, hanging gutters, Benches etc.

  • Screen: including the screens (e.g. shading/energy screen) and the related hardware such as gearboxes etc.

  • Lighting: for example, HP Sodium lamps, or LED lighting

  • Irrigation System: including pump station, piping and drip lines

  • Climate control system: including climate computer, sensors etc.

  • Misting System: for example, high/low pressure misting system

  • Electrical System: including all the electric wiring, switch boxes etc., related to the greenhouse, not considered in other sections

  • Ventilation System: for example, the fans inside your greenhouse

  • Cooling System: for example, pad & fan system, A/C etc.

  • Heating System: for example, boiler, hot air generators etc.

  • Harvesting Equipment: All the equipment (manual/automatic), used to harvest the crop. For instance, electric trolleys

  • Packaging and Sorting System: you may need to consider the price per m2 based on the total greenhouse area. For instance, if the costs of packaging system is €100,000, and the greenhouse Area is 100,000 m2 (10 ha), you may put the price of this system 1 €/m²

  • Cold Storage: same as the packaging and sorting system, if the costs of "Cold Storage" is €100,000, and the greenhouse area is 100,000 m2 (10 ha), then you may put the price of this system 1 €/m²

  • Other Greenhouse Equipment: If you have other costs (e.g. ground cover), you may put it here.

  • Installation Costs: all the cost related to greenhouse installation

  • Transportation Costs: for example, the shipment of equipment by ship/truck etc.

  • Customs Duties: if you purchase the greenhouse from outside your country, you may need to pay customs duties.

  • NOTE: You may ONLY fill either the green cells OR the white cells above them. You CAN NOT fill both.

  • Price [EUR/m2] Installation Year Maintenance [%/m2/year] Depreciation [Year]
  • Covering: In case you are building a plastic greenhouse, you may need to change the covering after 4-5 years. Here, you may indicate the costs and also the installation year.

  • Screen: if you are installing screens (e.g. energy screen) you may need to change the screen after 5 years. Please note that you only need to change the screen and NOT its mechanical parts.

  • Other Costs: If you have other related costs, please indicate them here.

  • Bank Loan: Please specify the amount of bank loan.

  • Interest Rate: this is the annual interest rate in %. By default, the interest rate is calculated from after the construction year.

  • Payback Period: depends on your bank

  • Breathing Space: Depending on your bank, you may have breathing space.

  • Working capital: the loan given by the bank, providing operating liquidity for your business

  • Bank Loan: Please specify the amount of bank loan in euro or desired currency

  • Interest Rate: the annual interest rate in %. By default, the interest rate is calculated from after the construction year.

  • Payback Period: Depending on your bank, specify the pay back period.

  • NOTE: You can fill either the green cells OR ONLY the white cells above it. YOU CAN NOT fill both.

    [€/m2/Year]
  • Planting Material: for example, costs of purchasing young plants

  • Energy - Heat: the total annual costs of heating the greenhouse. For this, you may need to calculate and invert the costs of purchasing natural gas in a year.

  • Electricity (kWh)

  • CO2 Purchase: to increase production, you may need to purchase CO2.

  • Crop Protection: for instance, Pesticide, and Pest control products

  • Fertilization: all nutrients given to plants

  • Other Materials: materials other than "Crop Protection" and "Fertilization"

  • Boxes and Packaging

  • Water (m³)

  • Other Costs: for instance, transport costs to deliver the product to supermarkets

  • NOTE: You can ONLY fill either the green cells OR its the white cells above them. You CAN NOT fill both.

  • Number of employee Salary [€/month]
  • Manager

  • Sub-Manager

  • Accountant

  • Plant Specialist

  • Technician

  • Sales and Marketing Manager

  • Ordinary Workers: the ones who work in cultivation areas

  • Price [€/year]
  • Office Rent

  • Office Expenses

  • Travel Expenses

  • Marketing Costs

  • Education: including all the costs associated with personnel training

  • Other Costs: for instance, consultancy costs for cultivation

  • To be able to fill the form and get the results, please register.

    You have already registered? Please login.

    About
    • A “shared language” for horticulture and finance sectors
    Message
    Location
    • Delft, Netherlands